Vadel2882 Vadel2882
  • 12-10-2022
  • Business
contestada

the top-down method for estimating project time and cost that uses weighted variables based on major parameters and is frequently used in the development of software is known as the method.

Respuesta :

Otras preguntas

whats the answer to 159,501 to the nearest thousand
What is the answer to p/3.7=5.1
last one for this chapterr
Barnbrack is a traditional Halloween food. What is it? A. A fruit cake B. A meat dish C. A pumpkin punch D. A special bread
m+4(2m-3)=-3. what is the answer
What was the trick originally in ‘trick or treat’? 1. Knock on the door and then run away 2. Throw water at the person opening the door 3. Sing a song to the pe
1/(n-8)-1=7/n-8 How do I solve this math problem?
What does inauspicious mean?
Miss booth has 16 red buttons and 24 blue buttons. she is making finger puppets. each puppet has the same number of blue buttons and red buttons. how many puppe
In which country did President George H. W. Bush have to practically disregard his humanitarian goals to achieve what he believed was in the best interest of th