tmax9725 tmax9725
  • 14-12-2022
  • Engineering
contestada

The development of specifications for the manufacturing equipment needed to make the product is the responsibility of: engineering. The process of preapproving suppliers for specific commodities or parts is known as: pre sourcing.

Respuesta :

Otras preguntas

3^x-5=81 Exponential equation
show the steps to solve the inequality. Then graph the solution set. -7x + 32 < 18 my graph goes to -5 to 5
A particle has 3 units of positive charge and 1 unit of negative charge.What is the overall charge of the particles?
I have to write a letter as a Canadian solider in the trenches during ww1 have to include feelings and experiences. Also historical facts.
Help on social studies 3 questions
how could your life change if global warming continues as scientists think it will
what is the greatest common factor of 56 and 21
how did Egypt's geography affect its farming method
How does food with proper nutrients benefit you? It provides energy and fights infections. It serves as a building block of protein. It maintains healthy muscle
A certain type of bamboo plant grow 1.2 feet in one day.At that rate how many feeet could the plant grow in 0.5 day