Mudboy9616 Mudboy9616
  • 16-01-2024
  • Physics
contestada

The speed of the mass at point A is 3.2 m/s, and at point B, it is 6.0 m/s. How much work is done on the mass between A and B by the force of friction?
a. 48 J
b. 72 J
c. 96 J
d. 120 J

Respuesta :

Otras preguntas

8. How did the Roman empire support its expansion and integrate culture on three continents? A. Building aqueducts, monuments, and other public works employed m
How many solutions does the system have? X+y=5 X+y=6
The sum of a number (n) and 20 is 55. Which equation shows this relationship?
Look at the circuit diagram. How many switches does the diagram show?
A nature center offers 2 guided walks. The morning walk is 2/3 mile. The evening walk is 3/6 mile. Which walk is shorter? r
He didn't eat rice.into passive
Suppose today is friday,what day of the week will be 65 days from now?
A regular decagon is mapped onto itsslf everytime it is rotated by how many degrees
How did cultural protest cause change in the status quo for African Americans?
what does the ghost instruct hamlet to do concerning hamlet's mother