Zenalover2108 Zenalover2108
  • 12-02-2024
  • Law
contestada

What does the consensus DOC 3.16.2 say? What makes the contractor " ... stop work and give immediate written notice of the condition to the owner and the Architect/ Engineer."
a) Change orders
b) Unforeseen conditions
c) Delay damages
d) Defective work

Respuesta :

Otras preguntas

CAN SOBODY PLEASE HELP ME WITH THIS SCIENCE HW 35 POINTS!!!!!!!!!!!!!!!
CAN SOMBODY PLEASE HELP ME WITH SCIENCE 30 PONITS!!!!!!!!!!!!! Charles Darwin's groundbreaking book, The Origin of Species, described the process of acquired t
How can the effects of one migration become a cause of another migration?
What causes chronic strains? A -- dehydration B -- improper lifting C -- sudden injury D -- repetitive motion
how does 1/8 divided by 1/4 equal 1/2?
Who was the first incumbent to lose the presidency?
Jarod bought 8 yards of ribbon.He needs 200 inches to use to make curtains. How many inches of ribbon does he have?
Using the formula C=2×n×r find the circumference of a circle of radius 5cm (n=3.14)
what are the partial products of 42x5
A necklace has 6 fewer metal beads than plastic beads. Complete the table to show the number of metal beads, a, and the number of plastic beads, b. Function: a