The following clause is included in a contract: "THE CONTRACTOR IS NOT RESPONSIBLE FOR DELAYS CAUSED BY WEATHER, EARTHQUAKES, FLOODS, OR OTHER ACTS OF GOD." This clause would limit the contractor's liability for delays caused by ________.
1) Weather
2) Earthquakes
3) Floods
4) Acts of God

Respuesta :

Otras preguntas

Complete each sentence below with the correct form of decir. que es difícil. Mi padre a. dice b. digo C. dicen d. decimos Please select the best answer from the
for what number of minutes will Plan A and Plan B cost the same
what is x if f(x)= 600
Ryan and Cartier are running backs for their school football team. In the last game, Ryan played in 1/5 of the game and Cartier played 5/9 of the game. If the g
A 2.4-m-high 200-m2 house is maintained at 22°C by an air-conditioning system whose COP is 3.2. It is estimated that the kitchen, bath, and other ventilating fa
the coach for a basket ball
why is it impotant for muslims to pray five time a day?
Why did the distance between America and Great Britain weaken the British in war
How does the cartoonist portray Uncle Sam
Signs warn you of hazards, like sharp curves and dips in the road A. Regulatory B. Warning C. Guide D. Construction