osayword847 osayword847
  • 14-02-2024
  • Engineering
contestada

No NOTAM action is required for NAVAIDs (TACAN, VOR, etc.) that are part of the National Airspace System if the time periods do not exceed ____.
a) 24 hours
b) 48 hours
c) 72 hours
d) 96 hours

Respuesta :

Otras preguntas

Today, the highest-ranking member of the president’s Cabinet is the __________.
The Spanish base at __________ provided an essential link between East Asia and the Americas.
The Scopes Trial made it legal to teach fundamentalism in school. True False
explain why world war 1 required total warfare
Factoriza 4x²-y²-6y-9
Which would be the least helpful for supporting interpretations about the lives of late nineteenth-century immigrants? A. a historical novel about working in th
The scientific name for a plant that reproduces with flowers is a what
Find the cost of 750g at 48p per kg
Which of the following sentences has the right punctuation? "I will in a minute," she replied, "as soon as I finish this chapter." Have you read the assigned sh
What happened during the Second Battle of Bull Run? Who won the Confederates or the Union?