Gabe2119 Gabe2119
  • 15-02-2024
  • Engineering
contestada

If work is to be performed near overhead lines, the lines must be __________ or other protective measures must be provided before work is started.
a) Insulated
b) Deactivated
c) Relocated
d) De-energized

Respuesta :

Otras preguntas

Please help!! Look at the image. Thanks!
what is the mood of sculpture​
HELP MEEEEEE 20 pOInts
(Matching Texts) and Structures Match each type of text with the most logical organizational structure. a letter to the editor problem and resolution a software
does favored have a strong positvite conotation to replace the word value
according to the direct instruction, which of the following is a leading cause to death among young peple in the united states
Read the excerpt from Infinite Jest. 'Hal's right as rain,' smiles my uncle, soothing the air with a casual hand. Just a bit of a let's call it maybe a facial t
Shelly and Terrence completed a different number of tasks in a game. Shelly earned 90 points on each task. Terrence's total points were 20 less than Shelly's to
the quotient of 9 3/4 and 5/8​
The mass of an atom Is found by adding Its protons and .The electric charge of an atom Is found by adding the charges carried by Its protons and .​