sethamus604 sethamus604
  • 16-02-2024
  • Mathematics
contestada

How many days will it take for b to complete the work alone if a and b can complete the work together in 6 days and b takes 8 x 5 less days than a to finish the work?
Equations:
(a + b) 6 = 1 (work done by a and b in 6 days)
b x = 1 (work done by b alone in x days)

Respuesta :

Otras preguntas

Which of the following was not part of the Teapot Dome scandal? a. oil c. bribery b. Wyoming d. the Secretary of State
use “bote de basura” in a sentence using hay
What is the opposite of 7 ?
Which item(s) will require a journal entry to update the balance in the Cash account? A. Checks outstanding and deposits in transit B. Bank service charges, not
Graph the equation. y = 4x – 3
What is the slope of the line through (-4,2)and (3,−3) Choose 1 answer: (Choice A) A 7/5 B -7/5 C 5/7 D -5/7
Different between the ironclad the monitor and the Merrimack
Simplify (7 1/5)5 Please show work
What happens to Jen and scout on their way home from the pageant. To kill a mocking bird. Ch28.
why is osmosis important to the survival of a cell