haleygrobertson70291 haleygrobertson70291
  • 14-03-2024
  • Business
contestada

What is the optimum schedule of the project and minimum duration with the corresponding cost?

a) 5-6 days, Rs. 180
b) 6-10 days, Rs. 300
c) 9-11 days, Rs. 120
d) 10-12 days, Rs. 450

Respuesta :

Otras preguntas

1) 5x-2y=4.         2) 3x-5y=13  x-2y=53x+y=9
help me plz with these questions.   the picture is question 1 and the written on is question 2.The base area of a prism is 150 square feet. Its height is 8 feet
A store is having a sale to celebrate president's Day. Every item in the store is advertised as one fifth off the original price. If an item is marked with a sa
A person walks out of a store with a pillow at the top of an overflowing shopping cart. While walking to the car, the cart's wheel hits a large rock, causing th
A person walks out of a store with a pillow at the top of an overflowing shopping cart. While walking to the car, the cart's wheel hits a large rock, causing th
a paddle boat can move at a speed of 6km/h in still water. the boat is paddeled 16km downstream in a river in the same time it takes to go 8km upstream what is
a) a pint is what fraction of a quartb) what fraction of a gallon is a quartc) what fraction of a gallon is a pintd) the answers to parts a-c show that one half
your family takes a taxi from the airport to your hotel. The total charge for the ride is $38.55. How much should you give the cab driver as a tip if you want t
0.4x+0.5y=2.5 1.2x-3.5y=2.5 ELIMINATION BY USING MULTIPLICATION
erika has 3 pieces of ribbon. each piece is 25 yards long she needs to cut pieces that are 22 inches long . what is the greatest number of 22-inch pieces that