A project has five activities as follows:
Activity: A, B, C, D, E
Preceding Activity: -, -, B, C, B
Duration (Days): 4, 8, 5, 9, 5
a) Find critical path using EST's / LST's
b) Calculate the floats of the network.

Respuesta :

Otras preguntas

A snowball is launched horizontally from the top of a building at v = 16.9 m/s. If it lands d = 44 meters from the bottom, how high (in m) was the building?
what type of rock is the Haystack rock (igneous, Metamorphic, or Sedimentary)
A snowball is launched horizontally from the top of a building at v = 16.9 m/s. If it lands d = 44 meters from the bottom, how high (in m) was the building?
what type of rock is the Haystack rock (igneous, Metamorphic, or Sedimentary)
A snowball is launched horizontally from the top of a building at v = 16.9 m/s. If it lands d = 44 meters from the bottom, how high (in m) was the building?
two methods of active transport
how have computers changed mapmaking in recent years
What's breed of given cat???Check attachment
A snowball is launched horizontally from the top of a building at v = 16.9 m/s. If it lands d = 44 meters from the bottom, how high (in m) was the building?
2 ( 4a - 12 ) + 3a = 6a + 1