diyakanta1970 diyakanta1970
  • 14-04-2024
  • Mathematics
contestada

Q.1 A small project is composed of 7 activities whose time estimates are listed in the table below: 1-2 1 5-6 3 6 15 4-6 2 3-5 2 5 2-5 1 1-4 2 1-3 1 Optimistic Time (Weeks) Most Likely Time (Weeks) Pessimistic Time (Weeks) 1 7 4 7 2 8 1 1 5 14 8 (a) Draw the project network. (b) Find the expected duration and variance of each activity.

Respuesta :

Otras preguntas

(2n3 - 3n4 + 7n) - (n3 - 8n4 - 7n)
Simplify Question 8 options: A) 8 B) 9 C) 6 D) 12
Iron is most notably known for its role in:
Please help! In your opinion, would online education benefit from more industry standardization and government regulation? Why it why not?
An astronaut on the moon throws a baseball upward. The astronaut is 6 ft, 6 in. tall, and the initial velocity of the ball is 50 ft per sec. The height s of the
what is the purpose of reconcilling your own records with the monthly bank statement ?
Michael cut away 3.01 meters of rope.Before that he had 6 meters of rope.How much rope does Michael have left
what is the chemical formula of ( methane ) ??​
cuantos gramos de soluto y solvente tendra 127 gramos de solición cuya concentración es 14% m/m ayuda para resolverlo
What is the answer to 2[5+2(8-6)]