Longjeremiahs8241 Longjeremiahs8241
  • 14-05-2024
  • Computers and Technology
contestada

How can Excel be used to calculate the critical path in a project network?
a. By using macros and VBA programming
b. By using the Data Analysis Toolpak functions
c. By manually analyzing the project network diagram
d. By using the Solver tool with appropriate constraints

Respuesta :

Otras preguntas

In what year did feminists first propose the ERA? 1891 1923 1954 1965 1982
0.9 written as a fraction is _____. 9/10 10/11 1
Rachel made a mosaic from different color rectangle tiles 3 tiles measured three and a half inches x 3 inches 6 tiles measures 4 inches x 3 1/4 inches what is t
Plants are considered producers true or false.
A natural resource that is mined for profit is called A. topsoil. B. ore. C. sand. D. aggregate
Zack had 2/3 of the lawn left to cut.After lunch,he cut 3/4 ig the grass he had left. How much of the whole lawn did zack cut after lunch
Mark each statement if it was an outcome of the Peloponnesian War. A. The Persians conquered Greece and put Sparta in charge. . B. Athenian political power en
what is 1/4b=-3 in linear equations
Why do cells divide? Why do they not keep on growing as the organism gets larger?
six students share eight apples equally. how many apples does each student get?