poullbrian6178 poullbrian6178
  • 13-03-2019
  • Mathematics
contestada

Humaid can shovel the driveway in 3 hours, and Humaid can shovel the driveway in 2 hours. How long will it take them working together?

Respuesta :

LEXIBELL03 LEXIBELL03
  • 13-03-2019

Answer:

2hours and 30 mins

Step-by-step explanation

Answer Link

Otras preguntas

given the equation y = -4x+9, what is the y intercept
A total of 28 tickets for the summer fair were sold. A child ticket costs $2.50 and an adult ticket costs $3.75. If the total cost of the tickets sold is $82.50
Use the graph to the right to write an equation of the line. What is the equation?​
Help me please I can’t find any adjectives
in order to set up for a rowing competition the crew needs to find a practice course in a lake using the "diagram" below determine which of the following reason
On Average,Jessica calculated that 17% of the time it snows during her drive to work. If she drives to work 180 days,How many days should it snow?​
which of the following statements are true? Check all that apply.
If it takes 65.3 min for the concentration of a reactant to drop to 20.0% of its initial value in a first-order reaction, what is the rate constant for the reac
what the equation of the quadratic function in standard form represented by the graph
While a match burns what type of change occurs? A. physical B. chemical C. physical and chemical D. neither physical nor chemical