sash11
sash11 sash11
  • 15-06-2019
  • Mathematics
contestada

If it takes 6 men 4 days to dig a hole 3 metres deep, how long will it take
10 men to dig a hole 7 metres deep?​

Respuesta :

Аноним Аноним
  • 15-06-2019

Answer:

I think the picture here explains you everything

hope this helped

Ver imagen Аноним
Answer Link
jasminreveles000 jasminreveles000
  • 25-02-2021

Answer:

8 days

Step-by-step explanation:

Answer Link

Otras preguntas

What is phrase for c/3?
jade has read 9 books in the same level. what are the possible points she earned if level a is 2 points, level b has 5 points and level c has 10 points?
When 1 carbon atom combines with 2 oxygen atoms, the resulting substance is called?
10 newton object on a pulley what force needs to be applied to lift it
What makes a rational number
What is your x– intercept when m = 2 and b = 4 ??
Is it ever grammatically correct to place a comma after the word 'and' when the 'and' is separating two main clauses
The martin family spent $518 on groceries in one week what is the average amount the family spent on groceries per day
Five times the sum of a number and 8 is 55
Cathy. volunteered to collect cans for a project.. cathy collected 125 cans in 5 days .there were 6 volunteers including cathy, who each collected about the sam