clevon2341 clevon2341
  • 12-10-2019
  • Business
contestada

What is the primary difference between variable costing and absorption costing?

Respuesta :

bukencybaby96
bukencybaby96 bukencybaby96
  • 12-10-2019
Variable costing method is used mostly for internal management decision making process. While absorption costing method is used for both internal and external decision making process
Answer Link

Otras preguntas

name two ways new france differed from new spain
Daoism and Confucianism shared an emphasis on A. the supernatural. B. life in this world. C. social structure. D. nature.
A rectangular blanket's perimeter is 210 inches. If the long sides of the blanket measure 60 inches, what is the length of the shorter sides of the blanket?
Daniel has 12 tennis balls. Manual has twice as many tennis balls as Daniel. Kendra has twice as many balls as Manuel . How many tennis balls do they have inall
what is the difference between a ant and a human?
what is 4.25 rounded to one decimal
how many molecules are there in 79g of Fe2O3? how many atoms is thi
share 18 in the ratio 2:4
Kevin has 3 bags of apples weighing a total of 22 1/2 pounds. Two of the bags weigh 6 3/8 pounds and 3 1/4 pounds. How much does the third bag weigh? A 11 7/8 B
Over the summer a bunch of math teachers from different schools got together for a BBQ. Not one of the teachers knew each other and greets each other with a hea