nioamicastro
nioamicastro nioamicastro
  • 15-05-2020
  • Physics
contestada

how much work is needed to lift a barbell that has a weight of 445 N a total of 2 meters off ground

Respuesta :

PiaDeveau PiaDeveau
  • 20-05-2020

Answer:

Total work done to lift barbell = 890 J

Explanation:

Given:

Weight of barbell (F) = 445 N

Height (Distance) = 2 meter

Find:

Total work done to lift barbell = ?

Computation:

⇒ Work = Force(F) × Distance

⇒ Total work done to lift barbell = Weight of barbell × Distance

⇒ Total work done to lift barbell = 445 N × 2 meter

⇒ Total work done to lift barbell = 890 J

Answer Link

Otras preguntas

Q1: A stock solution containing Mn+2 ions was prepared by dissolving 1.584 g pure manganese metal in nitric acid and diluting to a final volume of 1.000 L. The
If workers are more productive, the increase may not be reflected on the static budget variance if there were also:__________ A. Greater sales than planned B.
what do all organism meed? selecet three options nerves system a place to live blood water food
what is force? pls answer my question ​
what does personal attributes mean?
how can you relazie a perfect balck body in pratice​
Simplify: (3x2 − 5xy + 2y2) − (7x2 − 3xy − 3y2) (5 points) −4x2 + 8xy − y2 −4x2 − 8xy + y2 −4x2 + 2xy − 5y2 −4x2 − 2xy + 5y2
Find the value of x for which l||m
Essay writing about Amagoduka at glencoe station ​
Which equation has the graph shown below? (0, 3) (2,0) ​