akintayotimileyin5 akintayotimileyin5
  • 15-10-2020
  • Mathematics
contestada

6 lumberjacks can cut down 15 mahogany trees in 2 hours. How much longer will
it take 8 lumberjacks to cut down 35 mahogany trees working at the same rate?
B. 1}hr
c.hr
A. 3hr
D. 21hr​

Respuesta :

sqdancefan
sqdancefan sqdancefan
  • 15-10-2020

9514 1404 393

Answer:

  3.5 hr

Step-by-step explanation:

We assume that "the same rate" means effort per tree is a constant. "Effort" is measured as the product of lumberjacks and hours. Then ...

  (lumberjacks)(hours)/trees = (6)(2)/15 = (8)(t)/35

Multiplying by 35/8, we have ...

  (35/8)(12/15) = t = (3·4·5·7)/(2·3·4·5) = 7/2 = 3.5

It will take 8 lumberjacks 3.5 hours to cut down 35 trees.

Answer Link

Otras preguntas

7. Write an inequality to fit the graph at the right 4x - y = -4 How do I turn this into an inequality?
examples of rhetoric in greta thombergs speech​
Why should a goal be relevant
Shared assumptions are important because… conflicts can arise when they are missing. you can save yourself time by ignoring them when you write an essay. you ca
Which of the following reasons led to the origination of the Progressive movement? A passage of antitrust laws and regulations B. renewed interest in regulating
complete the table of the stages for aerobic cellular respiration.
what contradiction do you see in the way mistral father treated her ?
Find the midpoint of A and B where A has coordinates (-7,1) and B has coordinates (3,-5)
Use the information below to answer: After the selection event (the “after” graph), what gene would be considered a “fit” gene? Select one: a. Small beak gene b
Can someone please help me with these!!!!!