huntergregory
huntergregory huntergregory
  • 15-10-2020
  • Business
contestada

which one is the biggest part of your budget fixed or variable cost

Respuesta :

dpirouz dpirouz
  • 15-10-2020
It depends but variable costs are usually associated with unit production like ingredients or materials so fixed costs like capital expenditure might be the larger part of a budget
Answer Link

Otras preguntas

subartic, tundra, and ice caps are all found in the _______ climate zone (options are: tropical, high latitude, desert, midlatitude)
Is it possible to make CD without plastic? why or why not?
What Does 'Bury the Hatchet' Mean?
A pencil is dropped from the roof of the school what is the speed after 3s down is the negative direction. I'm confused on what equation to use
Transformand 20 de tone in kilograme se obtine .... kgCate kg?
Express the set in roster form.{x|x is a natural number multiple of 5}
During an experiment, which factors are observed and measured ?????
Find the sum of the first 8 terms of the sequence. Show all work for full credit.1, -3, -7, -11, ...
The sum of two numbers is 30 and their difference is 2.  Find the two numbers by writing and solving a system of equations
A pencil is dropped from the roof of the school what is the speed after 3s down is the negative direction. I'm confused on what equation to use