cr25nmiller cr25nmiller
  • 15-01-2021
  • Physics
contestada

a 950 N skydiver jumps from an altitude of 3000 m. What is the total work performed on the skydiver?

Respuesta :

quasarJose
quasarJose quasarJose
  • 16-01-2021

Answer:

2850000J

Explanation:

Given parameters:

Weight of diver = 950N

Altitude  = 3000N

Unknown:

Total work done by the sky diver = ?

Solution:

To solve this problem, we use the expression:

        Work done  = Weight x height

Now insert the parameters:

        Work done  = 950 x 3000  = 2850000J

Answer Link

Otras preguntas

Directions: Find a post online (preferably from social media) that provides information or a claim The post needs to be relatively school appropriate Fact Check
To find the distance across the river, the given diagram is laid out. what is the distance rounded to the nearest meter?
Define the five systems. Be sure to include enough information to distinguish each system from the others.
Drag the tiles to the correct boxes to complete the pairs. Not all tiles will be used. Match the values with the statistical measures for these data points. 34,
hello pls help me. khan academy sucks
The diagram shows part of the food web in Yellowstone National Park, Humans began removing gray wolves from the park in the early 1900s. How is removing the gra
Help ASAP on a timer ⏱
hello! answer Pls, No links.. (13 points and brainiest if i can).
President Jefferson did not favor building large seagoing ship because
Which president did NOT come up with a Reconstruction Plan after the Civil War? A.grant B. Johnson C.Lincoln