pinkplum5955 pinkplum5955
  • 11-03-2021
  • Mathematics
contestada

It takes one week for a crew of workers to pave 3/5 kilometer of a road. At that rate, how long will it take to pave 1 kilometer?

Respuesta :

ayfat23
ayfat23 ayfat23
  • 12-03-2021

Answer:

1.67 weeks

Step-by-step explanation:

Let X= time it will take to pave 1 kilometer?

1 week=3/5 kilometer

X week =1 kilometer

Cross multiply

3/5 X= 1

3X= 5

X= 5/3

1.67 weeks

Answer Link

Otras preguntas

How to write this equation
The graph of the equation y=f(x) passes through the points (-3,-5), (-2,-3),(0,1) and (4,9). What is the value of y in the equation y=f(-3)
what is 12-9×3×4+3 in three different ways
In Greek drama, the exodus is _____. the final choral ode the first stasimon the final episode the parados
What’s the definition of external influence?
what do the graphs of the two even degree functions (y = x^2 and y = x^4) have in common?
Which European nation claimed Alaska
The Great Pyramid of Giza is located in Egypt. It has a height of about 460 ft, and width of its square base is about 55ft.. (a) What is the area of the base of
An element is made of one type of what
simplify -sin^2x-cos^2x-tan^2x+cot^2x+sec^2x-csc^2x+2