grandemilenaa06 grandemilenaa06
  • 12-03-2021
  • Mathematics
contestada

if 9 men can complete a job in 4 days, how long will 8 men take to complete the same job, assuming that all the men are working at the same rate?

Respuesta :

irspow
irspow irspow
  • 12-03-2021

Answer:

Step-by-step explanation:

8t=9(4)

8t=36

t=4.5

So it will take 4.5 days for 8 men to finish the job.

Answer Link

Otras preguntas

AT Oils, a gas station, retails 30,000 gallons of petrol per year. Its ordering costs are $20 per order and holding costs are $40 per gallon. According to the e
est Luc? -De Lyon. - D'où - Combien - Comment - Qui
A Lil' help? ^^ すみません"General," said Rainsford firmly, "I wish to leave this island at once." The general raised his thickets of eyebrows; he seemed hurt. "But
Joshua is preheating his oven before using it to bake. The initial temperature of the oven is 75º and the temperature will increase at a rate of 25° per minute
A city currently has 60 family-owned restaurants. In the future, it is estimated that the number of those restaurants will decline at a rat of 18% per year. Bas
Controlling the physical world with sensors and digital devices depends on bandwidth and the ability to analyze data in real time. Select one: True False
Why did rulers often build massive buildings?
Science is based on
Which of the following is an odd function? f(x) = x3 + 5x2 + x f (x) = StartRoot x EndRoot f(x) = x2 + x f(x) = –x
can someone help me pls?