tomdarren2449 tomdarren2449
  • 11-06-2021
  • Business
contestada

What is the total cost to move products between work centers A and D, and between work centers B and C combined

Respuesta :

Munali Munali
  • 14-06-2021

Answer:

More than $0 but less than or equal to $100.

Explanation:

The transportation cost is $2.

Load summary is AB = 12, AC = 25, AD = 12, BC = -19, BD = 21, CD = 34.

The total cost to move product between A and D and B and C combined is ;

A and D = 12 * $2 = $24

B and C = 19 * $2 = $38.

Answer Link

Otras preguntas

The sum of the digits is 11. When rounded to the nearest hundred, it's 500. Rounding to the nearest 10 makes it 530. What's the number....
A body of mass 2 kg is moving in the positive X-Direction with a speed of 4 m/s collides head on with an another body of mass 3 kg moving in the negative X-Dire
Calculate the de Broglie wavelength of an electron traveling at 3.0 × 107 m/s (me = 9.1 × 10-31 kg).
Which causes fermentation?A. AntibodiesB. AntigensC. MicroorganismsD. Antibiotics
what is national library week?
What Is a Cause-Effect Essay?
how do I expand r(r-r2) the 2 is meant to be r squared
Electrons surround the nucleus of an atom and those that are in the outer energy levels are _____.less attracted to the nucleusmore attracted to the nucleusnot
what does 'keep your cool' mean?
An electronics company has been producing 1705 CD players a day working two shifts. The second shift has produced 95 Cd players fewer than four-fifths of the nu