zamyrie66 zamyrie66
  • 14-06-2021
  • Mathematics
contestada

20 men take 10 days to complete a piece of work. find the time taken by 8 men to complete the same piece of work

Respuesta :

michaelpuen12 michaelpuen12
  • 14-06-2021
For the 8 men to finish the work it would take 16.76 days to finish the piece of work
Answer Link

Otras preguntas

An observer measures a 100 Hz Doppler shift as an ambulance goes by. At rest, the frequency of the ambulance's siren is 2,000 Hz. What is the speed of the ambul
2. Solve the following:a. When six is added to four times a number the result is 50. Find the number.b. The sum of a number and nine is multiplied by -2 and the
10 6 What is the length of the missing side?
is anyone good with formating a mla work cited page
2/3=(x+7)/3x Its for my summer math, and I have forgot how to do these types of problems. please help 30 POINTS!!
Write in detail 5 goods that you get using money currency and 5 services that you can get using money currency
A person who lives with constant pessimism is experiencing what kind of stressor
Simplify i12 A.-1 B.-i C.i D.1
The length of a rectangle is 8cm less than twice it's width find the the dimensions of the rectangle if the area is 120cm(2)
Which is a main function of lipids?