abelmulugeta19 abelmulugeta19
  • 11-10-2021
  • Computers and Technology
contestada

consider 4 jobs arriving in ready queue in the same order at time =0 if BT requirements of these jobs are 4,1,8,1 respectively what is completion time of p1 assuming round robin with TQ =1

Respuesta :

marietavukadinovic marietavukadinovic
  • 11-10-2021

Answer:tq we

Explanation:

t rhh

Answer Link

Otras preguntas

Explain how the atomic theory was modified from Dalton's theory to Rutherford's. Include an explanation of why the theory was modified.
Complete the passage about metallic bonding.
True or false? Mitosis is another name for the cell cycle.
Toys R Us is having a 38% off sale on all of their backpacks. Ifa backpack normally costs $22.00, how much will it be on sale?
PLEASE HELP!!!!!!!!!!! Which equation represents a direct linear variation? y=1x y=25x y = x + 3 y = x2
A rod of length L is pivoted about its left end and has a force F applied perpendicular to the other end. The force F is now removed and another force F' is app
The American Expeditionary Force contribution to World War I a. played a relatively minor role in ending the war. b. came too late to offer any real assistan
In California, the statute of limitations for breach of an oral contract is two years after the breach. If Angela, a party to an oral contract made in July 2012
Vladivostok is a Russian city located on the sea of Japan? true or false
Write a linear equation in slope intercept form that passes through the points (-5, -8) and has a slope of 4/5