suareza36
suareza36 suareza36
  • 13-01-2015
  • Mathematics
contestada

a machine stamps 360 metal parts in 15 minutes. Find the unit rate in parts per hour

Respuesta :

thisisbenmanley
thisisbenmanley thisisbenmanley
  • 13-01-2015
Just divide the number of parts made by the number of hours to get parts per hour.  15 minutes is 1/4 of an hour, so we divide 360 by 0.25 hours:

[tex](\frac{360\ parts}{0.25\ hours}) = 1440\ parts\ per\ hour[/tex]
Answer Link
123jas321 123jas321
  • 13-01-2015
15 minutes is 1/4 of an hour which is .25 hours
so all you got to do is divided the total number of metal parts divided .25 hours
360/.25=1440 metal parts in one hour
Answer Link

Otras preguntas

What is the maximum number of turning points the function f(x)=7x^5+6x^3-4x^2+1 , can have
What is the maximum number of turning points the function f(x)=7x^5+6x^3-4x^2+1 , can have
Which mathematical relationship best describes a graph of gravitational field strength versus distance? (one of the 3 pictures attached or none of the above?)
What is 97.356 in base ten numerals
state the purpose of making urine.
What digit is in the ten thousandths place of the number 43,310.60975?
what is the perimeter of the inside of the track?use 3.14 for pie
why food coming from stomach is to be made alkaline?
What is 97.356 in base ten numerals
Bombarding sodium-23 with a proton produces nuclide X and a neutron. What is nuclide X? Answers: magnesium-24 magnesium-23neon-23 sodium-24 none of the aboveT