riverscelena
riverscelena riverscelena
  • 15-11-2021
  • Mathematics
contestada

The tune up team can do 120 tune ups per day. If each employee can do 30 tune ups in a day, how many employees are there?

Respuesta :

andreag3608
andreag3608 andreag3608
  • 15-11-2021

Answer: 4 employees     4 x 30 is 120

Answer Link

Otras preguntas

angie has 12 feet if string.She will cut the string into equal lengths of 5 inches each.How much string will be left after she cuts as many of these lengths as
Express the set in roster form.{x|x is an integer greater than -6}
write quadratic equation whose roots are 4 and -3 and whose leading coefficient is 5 use the letter X to represent the variable ? =0
could you tell me what is a genre?
what are the principal parts of a verb?
waht will happen if one of the system fails to carry out its function properly?
What is aerobic and anaerobic respiration ?
The sum of two numbers is 30 and their difference is 2.  Find the two numbers by writing and solving a system of equations
what is a example of democracy?
how do i say have a nice day in Spanish