kkgabby12 kkgabby12
  • 15-12-2021
  • Engineering
contestada

Engineers plan to develop a new drill for use on oil rigs.
What should the engineers do first in order to develop the
new drill

Respuesta :

Аноним Аноним
  • 15-12-2021

Answer:

Conduct research on features for a new drill

Explanation:

Follow instagrm at ➜ mvnnyvibes

Answer Link

Otras preguntas

California and Texas had greatest increases in what resources? oil production population railroads wheat farming
Pls help I don’t understand
What four numbers can equal 15?? Please help!!
What is the longest side of a right triangle called?
What is the simplified form expression 2(x-5)?
Danny is older than Felicia. The difference between their ages is 21. The sum of their ages is 35. How old is Felicia?
Find the area of a regular pentagon with an apothem of 3.1ft and a side length of 4.5ft. Round your answer to the nearest whole number
1 2/5 x 1 1/4 simplify as much as possible right answer as a mixed number pls
what is the main idea of monetarism
For f(x)=5x−x2 , use the definition of a derivative to find f′(x)