kkgabby12 kkgabby12
  • 15-12-2021
  • Engineering
contestada

Engineers plan to develop a new drill for use on oil rigs.
What should the engineers do first in order to develop the
new drill

Respuesta :

Аноним Аноним
  • 15-12-2021

Answer:

Conduct research on features for a new drill

Explanation:

Follow instagrm at ➜ mvnnyvibes

Answer Link

Otras preguntas

[tex]\underline{\boxed{\blue{\Large{\bf{Hello\:Brainlians}}}}}[/tex]Find the area of the triangle formed by the likes joining the vertex of the parabola x^2=12y
PLS HELP!! I WILL GIVE BRAINLIEST :) Here is a number puzzle. Fill in each blank with a number so that every row, column, and diagonal adds up to the same tota
Can anyone please help me out with this??? PLEASE AND THANK YOU
Why do we wear white or light coloured clothes in summer?Why do we wear black or dark coloured clothes in winter?​
What happens as a result of the Giant putting the boy atop the tree? A The tree loses its blossoms. B The children realize that the Giant has changed. C The Gia
pls help me with this problem
help find area pls :(
1) Given that the function graphed is f(x), what is f(9)? es A) 7 B) 9 C) 11 D) 13
Please help me:() show work thanks!!
What 2 numbers add up to 5 and multiply to 4?​