ambikathapa2010 ambikathapa2010
  • 12-02-2022
  • Mathematics
contestada

sanaya can do 1/3 part of a work in 1 day and chahanaa can do1/4 part of the same work in 1 day .How much work would they do working together​

Respuesta :

nyajahdonawa811 nyajahdonawa811
  • 12-02-2022

Answer: 36/5= 7.2 days to complete sanaya work day

Step-by-step explanation:

Answer Link

Otras preguntas

Analyze the foot of the following word. Use a dictionary if necessary. again iambic trochaic
rewrite the equations in slope-intercept form. Determine the slope. 1.) 6X + 2Y = 10             2.) 3X - Y = 4                3.) Y + X = 7                  4
Under florida law, a driver can refuse to submit to a test for alcohol or drugs without any consequence. true or false.
Ancient Egyptian society was more gender-stratified than Mesopotamian society.
Plant cells have a cell wall, which means that gene transfer can be done only by physical methods. Which method would be preferred for the production of a pesti
What is a dynasty? a. a series of rulers chosen by the people of a country b. a ruling family that remains in power for many years c. a system of government
By pairing the ringing of a bell with the presentation of meat, the russian physiologist __________ trained dogs to salivate at the sound of a bell even when no
how many yards in 26 feet
what is the resistance of a light bulb if a potential difference of 120 v will produce a current of 0.5 a in the bulb? 0.0042 0.5 60 240
The _______ makes up the largest portion of the brain. a. spinal chord b. cerebellum c. medulla oblongata d. cerebrum