Roadstone Limited can resurface 7/8km of a road in a day. How many days will it take
to resurface a road of length 14 km?

Respuesta :

profarouk profarouk
  • 15-05-2022

Answer:

16 days

Step-by-step explanation:

Let x be the number of days that it will take.

7/8 km per 1 day

14 km    per x day

We have to solve the equation:

[tex]\frac{x}{1} =\frac{14}{\left( \frac{7}{8} \right) }[/tex]

[tex]\Longrightarrow x=14\times \frac{8}{7} =2\times 8=16[/tex]

Answer Link

Otras preguntas

5 is 5% of what number w
how did macbeth descended further into evil in act 4
CAN SOMEONE PLZ HELP :C
An electric vehicle starts from rest and accelerates at a rate of 1.8 m/s2 in a straight line until it reaches a speed of 17 m/s. the vehicle then slows at a co
One minus the product of four and a number x.
what song represents miss maudie in the book To Kill a Mockingbird.(songs besides eye of the tiger)
With bradycardia there is a ? Fast heart rate Process of recording heat rate Condition of a slow heart rate Reversal of an abnormal heart rate
An object is 25.0 cm from the mirror, its height is 5.0 cm, and focal length is 8.0 cm. What is the distance from the image to the mirror? 0.085 cm 1.6 cm 9.8
On Monday Sarah had homework in 7⁄10 of her classes, Tuesday 3⁄5 , Wednesday 9⁄11 , and Thursday 1⁄2 . Which day did she have the most homework? A. Wed
the volume for the above figure is