A construction crew has just built a new road. It took them 8 weeks to build 10.24 kilometers of road. At what rate did they build the road?

Respuesta :

Aswanglol6
Aswanglol6 Aswanglol6
  • 15-09-2022

Answer:

Are you trying to figure out how long the road is?

10.24 km per week, times 4 weeks.

10.24 x 4 = 40.96

Step-by-step explanation:

Answer Link

Otras preguntas

when did victoria justice start playing the piano
what does an author use to create tone or mood in a story? the detail of main plot events. or vocabulary and diction?
Neiterkob was confused at first. It was one thing for an eruption to send cows flying up into the sky, but it was another problem entirely to get them down to e
A person being held by police for days without being charged with a crime is an example of a?
How does HIV affect the human body?
Chromosome is to cactus as gene is to _____. desert weeds needle
What is the narrative point of view in this excerpt from "The Gray Champion" by Nathaniel Hawthorne?
A valid password on a Web site contains 2 letters (A-Z, 26 total), followed by 3 digits (0-9). Letters and numbers can be repeated. The number of possible passw
In this fictional map,which elements suggest relative location? A. West Island B. Whye Strait C. Howe Strait D. North and South Piglet
A scale drawing has a scale of 3in:1ft. What is the scale factor?