minayabarker minayabarker
  • 14-06-2017
  • Health
contestada

Which Of The following is not a important component planing ahead

Respuesta :

LebronJames23x
LebronJames23x LebronJames23x
  • 14-06-2017
The answer which is not an important component of planning ahead is constructing an inflexible plan. The plan needs to flexible and changed if necessary. 
Answer Link

Otras preguntas

What mass of electrons would be required to just neutralize the charge of 5.0 g of protons? (the mass of a proton is 1.67262×10−24g, and the mass of an electron
what is the answer to 2/3(5x+6)=34
Liquid media is ________________ a. a media that consists of natural or synthetic mineral or plant substances that deposit crystalline or splinter-like fragment
Who topping covers more of the pizza 2/8 or 5/8
Match each type of tissue with its function
What is least likely to be a direct determinant of health?
Judy built a rectangular patio that is 9 meters wide and has a perimeter of 40 meters what is the length of Judy’s patio
what was christopher columbus first new world discovery when he went on his exploration voyage in 1492
what is the slope of the line that contains the points (-1,2) and (3,3)? A. -1/4 B. 1/4 C. 4 D. -4
When the Nationalist Party of South Africa supported apartheid, what belief did it support? Nonwhites were entitled to housing, jobs, and land ownership. Peopl