hayleybishop3638 hayleybishop3638
  • 13-07-2017
  • Business
contestada

All employees participate in a project team within a _____ structure. they are known as two-boss employees.

Respuesta :

BlueSky06
BlueSky06 BlueSky06
  • 27-07-2017
The answer is organizational structure. This happens to make sure the whole plan, dissemination, and implementation are followed. Employees get to have more than one boss but have one that has a direct link with all the decisions and makes necessary plans and specific function of the team reaches every member.
Answer Link

Otras preguntas

am i right? i just need to make sure
The number of electrons in the valence shell of aluminum is
Solve for n. 39 = n − –12 n =
On the first day of class, Alana skimmed the first 17 pages from each of the books assigned in her literature class. Each assigned book has an equal number of p
Steve’s score in a card game is five points away from zero. Denias score is the opposite of Steven’s and is a positive value what is denias score
Algoritmo que permita calcular el área de un cuadrado
100cm³of a solution of potassium hydroxide contains 0.56g of the dissolved solute. What is the molar concentration of this solution?
The points P(3,-2), Q(10,-2), and R(3,-8) are the vertices of a triangle. What is the approximate length of side RQ?* Help ASAP
Traditionally, the study of chemicals that do not contain carbon is called _____ chemistry. physicalinorganicbioanalytical​
please help me find out what x=