Noah5379 Noah5379
  • 14-08-2017
  • Biology
contestada

In which stage in the project life cycle would crashing likely be performed?

Respuesta :

Erudite1
Erudite1 Erudite1
  • 24-08-2017
Crashing would likely be performed at the CONTROL STAGE in a project life cycle.
Project crashing is a cost reduction method in which the project duration is shortened by reducing the time that it take to execute one or more critical project activities to less than its normal time. In crashing, resources are added to the project by spending the least possible cost.
Answer Link

Otras preguntas

Humans breathe through bronchi. Which structure do insects have for breathing? tracheae O lungs O skin O gills Pls help
Which monosaccharides make up sucrose?
The __________ statement is one or two sentences that state the focus of the text. main thesis concluding introductory
Kennings for car, shopping mall, computer, Zoom, the year 2020
What is the “Gospel” Carlyle speaks of? A. work B. the self C. the Bible D. song E. honor
Find the slope of the line.
formula of area of rectangle​
James is planning on registering for a course in electrical engineering. Which of the following sub-disciplines could he opt for? Instrumentation engineering P
2. How might observations by scientists impact the decision-making that affects the wolf's natural environment?
The defect rate for data entry of insurance claims at Sadegh Kazemi Insurance Co. has historically been about 1.50% This exercise contains only parts a, b, c, d