BWomack9740 BWomack9740
  • 13-11-2017
  • Mathematics
contestada

What is the probability of finishing a project on or before 22 weeks if the mean (expected) total duration is 18 weeks and the variance is 4 weeks?

Respuesta :

DAVIDgiane363 DAVIDgiane363
  • 14-08-2018
that would be 100 percent
Answer Link

Otras preguntas

Gettysburg Address What happened 87 years ago? What did it represent?
What is the solution to the equation fraction 1 over 4x = 5? A) x = fraction 4 over 5 B) x = fraction 5 over 4 C) x = 20 D) x = 1
Along a mid-ocean ridge, rocks _____ moving away from the ridge.
there's 251 students 6 tide in car and the rest in 7 buses how much are in the buses
The sales tax on a $350.00 computer is $22.75. Find the sales tax rate.
The diagram above is an example of a(n) ______. A. Supply schedule B. Pricing chart C. Inventory scale D. Projection scale.
which generals wife provided food and comfort during the winter war at valley forge
Prophase is the first stage of mitosis proper True or false
Shannon needs 9 feet of ribbon for an art project. How many inches of ribbon should she buy if she is making 4 projects
which of the following is NOT necessary to categorize an area as a civilization? Writing system Surplus of food Division of labor Having cities built