tjacqueline2277 tjacqueline2277
  • 12-01-2018
  • Business
contestada

A good system of internal control requires that the job order cost sheet be destroyed as soon as the job is complete.
a. True
b. False

Respuesta :

jacintap21 jacintap21
  • 13-01-2018
a good system of internal control requires that the job order cost sheet be destroyed as soon as the job is B)False
Answer Link

Otras preguntas

Which type of energy is produced by vibrations traveling in waves? A. chemical energy B. nuclear energy C. sound energy
Showstopper Inc. dominates the ladies' wig market and wants to expand into men's toupees. How can Showstopper's managers determine whether the company should de
What is the relationship between the area of ABCD and the area of EFGH? Quadrilateral ABCD with side measures 18 for AB, 24 for BC; quadrilateral EFGH with side
All of the following affect the value of a call option except the: A) strike price. B) stock price. C) standard deviation of the returns on a risk-free asset. D
Why do.we need inactive ingredients?
22 tons is equivalent to ______ kilograms.
Which term describes a time period marked by a change that begins a new period of development? century decade era millennium
ABC Company purchased land with an old building. ABC plans to demolish the old building and then construct a​ new, modern building. The cost of demolishing the
(−2a+5−b)⋅(−5) <- does this equal to 10a−25+5b?
Allocating funds to promotion whereby the company determines its promotion objectives, outlines the tasks to accomplish these objectives, and determines the pro