tek1013 tek1013
  • 15-03-2018
  • Mathematics
contestada

Working together Shawn and Hector can instal a tile floor in 6 hours. It would take Shawn 9 hours to do the job alone.

What is the value of r, the part of the tile that Hector could install in 1 hour?

a. 1/18
b. 1/9
c. 1/3
d. 2/3

Respuesta :

anthea611
anthea611 anthea611
  • 28-06-2018
The answer is 1/18. I just answered with 1/9 and it was wrong. Thank you for the help though!
Answer Link

Otras preguntas

P(|z|>1.96) solve this problem
how do i study for exams last minute?
Which one of the fallowing statements contains a metaphor
An object on earth weighs 120 N. What is it’s mass ?
Individuals with _____ walk, gesture, and talk slowly. on the other hand, people with _____ can't sit still and may move around or fidget aimlessly.
Loan Amount: $13,000 Method of payment: discount basis Amount of Interest: $625 Term of loan: 1 year Effective Rate of Interest (to the nearest tenth) = _____.
A compound has an empirical formula of co3 and a molar mass of 120 g/mol. what is the molecular formula
What is power of a hair dryer if it uses 72000 found a of energy in 60.0 seconds
what is a process of interaction and integration among people, businesses, and governments of different cultures?
what is the percent by mass of sodium in Na2SO4?