promxo19 promxo19
  • 15-02-2017
  • Mathematics
contestada

the company found that an experienced surveyor can survey a roadbed in 5 hours. An apprentice needs 8 hours to survey the same stretch of road. If the two work together, find how long it takes them to complete the job.

Respuesta :

MickeyMouseiLover
MickeyMouseiLover MickeyMouseiLover
  • 15-02-2017
40 hours is the answer
Answer Link

Otras preguntas

There are 50 questions to answer in a trivia contest. Each player starts with 100 points. He or she earns 10 points for each correct answer but loses 4 points w
find the area of a circle with a diameter of 22 inches?
what do you call two ratios that have the same value
9/10 divided by (1/10 plus 2/5)
Geoffrey ate  2/3 of a mini pizza. Claire ate 1 3/4  times as much pizza as Geoffrey.  How many mini pizzas did Claire eat? Express your answer in simplest form
what do you call two ratios that have the same value
what is x3+3x2-x-3 factor by grouping
what is x3+3x2-x-3 factor by grouping
There are 50 questions to answer in a trivia contest. Each player starts with 100 points. He or she earns 10 points for each correct answer but loses 4 points w
McDonald's has sold more than a billion hamburgers. If it were possible to eat a hamburger every minute of everyday (day and night) without stopping, how many y